Re: Renal Workshop Move

Posted by John Nixon on
URL: http://art-forum.84.s1.nabble.com/Renal-Workshop-Move-tp1427p1434.html

Hi Kevin

hope your well, we had a temp move at a number of years ago and the renal lab was on level 7 in one building and the with acute\transplant and the outpatient renal ward was on level 2 in another building with no lab. It was a nightmare to move the machines to the lab and back especially waiting for a lift with enough room for the Tec and machine avoid if possible try to get the consultants and staff to help fight your case

kind regards

John