Cheers Garry, John and Chris.
We look to be getting our panels now replaced under the PFI life cycle program.
Going forward the drains will be looked after by estates and so will the central delivery network as it runs through a lot of places we don't have access to anyway. (ceilings etc).
We will be responsible for the machine side of the connection only and also the flexible permeate connection to the machine. (we have the dead space free to point of use connections from Lauer)
We will be responsible for the permeate side because we know the implications of having to do anything with it with regards to other wards that use the same water plant. Other than that, estates will be our first call.
Ian Wilde